Tel.: +86-150 7112 0854  Email: abby@tensense-geotech.com

Anchor Bolt Procedure for Slope Stabilization

Anchor Bolt Procedure for Slope Stabilization

Anchor Bolt Procedure for Slope Stabilization 1. Site Preparation Survey and Design:Begin with a comprehensive site survey to evaluate the slope or wall. Based on the soil conditions, a design is developed specifying the required length, diameter, spacing, and inclination of the anchor bolts. Excavation:Excavation is performed in stages, typically 1 to 2 meters deep at […]

PowerChina completes first Jakarta-Bandung rail beam in Indonesia.

Warm congratulations to PowerChina for the successful closing of the first multi-span rigid frame continuous beam on the whole line of the Jakarta-Bandung high-speed railway in Indonesia    People’s Daily Online, Jakarta, May 10 (Reporter Xu Wei) On May 10, the first multi-span rigid frame continuous beam on the entire Jakarta-Bandung high-speed rail line in […]