On-Site Training Completed at the Singapore T5 Airport Project


Tensense Geotech recently completed an on-site technical training program at the Singapore T5 Airport Project, where our engineering team worked closely with the customer to support the application of the Ultrasonic Drilling Hole Monitor (UDM) during foundation construction. The visit was part of our commitment to helping customers fully utilize our equipment in real construction […]
Successful Ultrasonic Drilling Hole Monitor Training Completed in Hanoi, Vietnam


Successful Ultrasonic Drilling Hole Monitor Training Completed in Hanoi, Vietnam In late October 2025, the our after-sales service team successfully conducted a three-day on-site technical training session in Hanoi, Vietnam, focusing on the operation and application of the Ultrasonic Drilling Hole Monitor (UDM)—our advanced system for assessing borehole and diaphragm wall quality. This […]
Tensense Geotech Contributes to Nan River Bridge Project in Thailand


Bridges are more than just infrastructure; they are vital arteries that connect communities, enable commerce, and support development. Behind the scenes of every successful bridge project lies a rigorous commitment to quality control and structural integrity—especially at the foundation level. One essential tool that made a significant contribution to the recent bridge construction over […]
National Coal Mine Gas Governance On-site Promotion Conference Convenes


National Coal Mine Gas Governance On-site Promotion Conference Convenes March 20-21, Huaibei City – Hosted by the National Mine Safety Administration and organized by Huaibei Mining Group, the National Coal Mine Gas Governance On-site Promotion Conference was grandly held in Huaibei. As a bellwether event in coal mine safety, the conference brought together over […]
Anchor Bolt Procedure for Slope Stabilization


Anchor Bolt Procedure for Slope Stabilization 1. Site Preparation Survey and Design:Begin with a comprehensive site survey to evaluate the slope or wall. Based on the soil conditions, a design is developed specifying the required length, diameter, spacing, and inclination of the anchor bolts. Excavation:Excavation is performed in stages, typically 1 to 2 meters deep at […]
PowerChina completes first Jakarta-Bandung rail beam in Indonesia.


Warm congratulations to PowerChina for the successful closing of the first multi-span rigid frame continuous beam on the whole line of the Jakarta-Bandung high-speed railway in Indonesia People’s Daily Online, Jakarta, May 10 (Reporter Xu Wei) On May 10, the first multi-span rigid frame continuous beam on the entire Jakarta-Bandung high-speed rail line in […]

