Tel.: +86-150 7112 0854  Email: abby@tensense-geotech.com

Tensense Geotech Contributes to Nan River Bridge Project in Thailand

Ultrasonic Borehole Siting Testing & Quality Control System

  Bridges are more than just infrastructure; they are vital arteries that connect communities, enable commerce, and support development. Behind the scenes of every successful bridge project lies a rigorous commitment to quality control and structural integrity—especially at the foundation level. One essential tool that made a significant contribution to the recent bridge construction over […]

National Coal Mine Gas Governance On-site Promotion Conference Convenes

National Coal Mine Gas Governance On-site Promotion Conference Convenes

National Coal Mine Gas Governance On-site Promotion Conference Convenes   March 20-21, Huaibei City – Hosted by the National Mine Safety Administration and organized by Huaibei Mining Group, the National Coal Mine Gas Governance On-site Promotion Conference was grandly held in Huaibei. As a bellwether event in coal mine safety, the conference brought together over […]

Anchor Bolt Procedure for Slope Stabilization

Anchor Bolt Procedure for Slope Stabilization

Anchor Bolt Procedure for Slope Stabilization 1. Site Preparation Survey and Design:Begin with a comprehensive site survey to evaluate the slope or wall. Based on the soil conditions, a design is developed specifying the required length, diameter, spacing, and inclination of the anchor bolts. Excavation:Excavation is performed in stages, typically 1 to 2 meters deep at […]

PowerChina completes first Jakarta-Bandung rail beam in Indonesia.

Warm congratulations to PowerChina for the successful closing of the first multi-span rigid frame continuous beam on the whole line of the Jakarta-Bandung high-speed railway in Indonesia    People’s Daily Online, Jakarta, May 10 (Reporter Xu Wei) On May 10, the first multi-span rigid frame continuous beam on the entire Jakarta-Bandung high-speed rail line in […]