Tel.: +86-150 7112 0854  Email: abby@tensense-geotech.com

Successful Ultrasonic Drilling Hole Monitor Training Completed in Hanoi, Vietnam

Key Parameters and Testing Techniques for Drilled Hole Quality in Pile Foundation Engineering

Successful Ultrasonic Drilling Hole Monitor Training Completed in Hanoi, Vietnam   In late October 2025, the our after-sales service team successfully conducted a three-day on-site technical training session in Hanoi, Vietnam, focusing on the operation and application of the Ultrasonic Drilling Hole Monitor (UDM)—our advanced system for assessing borehole and diaphragm wall quality.   This […]

Tensense Geotech Contributes to Nan River Bridge Project in Thailand

Ultrasonic Borehole Siting Testing & Quality Control System

  Bridges are more than just infrastructure; they are vital arteries that connect communities, enable commerce, and support development. Behind the scenes of every successful bridge project lies a rigorous commitment to quality control and structural integrity—especially at the foundation level. One essential tool that made a significant contribution to the recent bridge construction over […]

National Coal Mine Gas Governance On-site Promotion Conference Convenes

National Coal Mine Gas Governance On-site Promotion Conference Convenes

National Coal Mine Gas Governance On-site Promotion Conference Convenes   March 20-21, Huaibei City – Hosted by the National Mine Safety Administration and organized by Huaibei Mining Group, the National Coal Mine Gas Governance On-site Promotion Conference was grandly held in Huaibei. As a bellwether event in coal mine safety, the conference brought together over […]

Anchor Bolt Procedure for Slope Stabilization

Anchor Bolt Procedure for Slope Stabilization

Anchor Bolt Procedure for Slope Stabilization 1. Site Preparation Survey and Design:Begin with a comprehensive site survey to evaluate the slope or wall. Based on the soil conditions, a design is developed specifying the required length, diameter, spacing, and inclination of the anchor bolts. Excavation:Excavation is performed in stages, typically 1 to 2 meters deep at […]

PowerChina completes first Jakarta-Bandung rail beam in Indonesia.

Warm congratulations to PowerChina for the successful closing of the first multi-span rigid frame continuous beam on the whole line of the Jakarta-Bandung high-speed railway in Indonesia    People’s Daily Online, Jakarta, May 10 (Reporter Xu Wei) On May 10, the first multi-span rigid frame continuous beam on the entire Jakarta-Bandung high-speed rail line in […]